When creating a report or mass load whose design is similar to another report or mass load, you can save time by copying the old design to the new report or mass load and then making the needed changes.
To copy a report or mass load design:
Log into the character-based system. This feature is not available in a Solar Eclipse interface.
With a report or mass load design displayed on the Report Writer/Mass Load Design screen, use the Copy hot key to display the copy prompts screen.
The Work ID field displays the ID of the design to copy.
In the Copy To field, enter a new report or mass load ID.
The system copies the displayed design and stores it using the new ID. The screen continues to display the original design.
Press Esc to exit the original design and display a blank Report Writer/Mass Load screen.
In the Design ID field, enter the new report or mass load ID.
When finished, press Esc to save your changes.
See Also: