Setup cost is any cost incurred in preparation for processing a single unit of measure, and Process cost is any costs incurred for processing multiple units of a product, based on the unit of measure (UM) setup.
Setup Cost: $9
Process Cost (Proc Cost): $2
UoM (Unit of Measure): Lot
Materials Used:
Material 1: Cost = $10 (1 EA)
Material 2: Cost = $5 (1 EA)
Material 3: Cost = $20 (1 EA)
Number of Finished Goods (EA) generated = 3
1 Lot = 3 EA
Total cost:
| Cost Material1 x 1EA + Cost Material2 x 1EA + Cost Material3 x 1EA + Setup Cost x 1 + Process Cost x 1 |
| 10 + 5 + 20 + 9 + 2 = 46 |
Here, the total cost is $46.
Setup Cost: $9
Process Cost: $2
UoM (Unit of Measure): EA (Each)
In this case, because UM = EA, the process cost will apply for each processed unit.
Materials Used:
Material 1: Cost = $10 (1 EA)
Material 2: Cost = $5 (1 EA)
Material 3: Cost = $20 (1 EA)
Number of Finished Goods (EA) generated = 3
Total cost:
| Cost Material1 x 1EA + Cost Material2 x 1EA + Cost Material3 x 1EA + Setup Cost x 1 + Process Cost x 3 |
| 10 + 5 + 20 + 9 + 6 = 50 |
Here, the total cost is $50.
Setup Cost: $9
Process Cost: $2
UoM : C
Materials Used:
Material 1: Cost = $10 (1 EA)
Material 2: Cost = $5 (1 EA)
Material 3: Cost = $20 (1 EA)
Number of Finished Goods (EA) generated = 3
Total cost:
| Cost Material1 x 1EA + Cost Material2 x 1EA + Cost Material3 x 1EA + Setup Cost x 1 + Process Cost x (3EA/100) |
| 10 + 5 + 20 + 9 + 2 x 0.03 = 35 + 9 + 0.06 = 44.06 |
Here, the cost calculation is proportional to the UoM.
For instance,
Processing Qty = 275
Now, because UM = C, the system divides 275 by 100, then multiply the result for the processing cost.
Say, processing cost = $2
275 / 100 = 2.75 x 2 = $5.5
Here, the total cost is $44.06.
Setup Cost: $9
Process Cost: $2
UoM (Unit of Measure): C
Materials Used:
Material 1: Cost = $10 (per EA)
Material 2: Cost = $5 (per EA)
Material 3: Cost = $20 (per EA)
Number of Finished Goods (EA) generated = 250
Total cost:
| Cost Material1 x 250EA + Cost Material2 x 250EA + Cost Material3 x 250EA + Setup Cost x 1 + Process Cost x (250EA/100) |
| 2500 + 5000 + 1250 + 9 + 2 x 2.5 = 8759 + 5 = 8764 |
Here, the total cost is $8764.
Setup Cost: $9
Process Cost: $2
UoM (Unit of Measure): M
Materials Used:
Material 1: Cost = $10 (per EA)
Material 2: Cost = $5 (per EA)
Material 3: Cost = $20 (per EA)
Number of Finished Goods (EA) generated = 9999
Here, M counts the cost for each 10000 EA.
Let's suppose the input is 250 EA and the output is 9999 EA.
Total cost:
| Cost Material1 x 250EA + Cost Material2 x 250EA + Cost Material3 x 250EA + Setup Cost x 1 + Process Cost x (9999EA/100) |
| 2500 + 5000 + 1250 + 9 + 2 x 9.999 = 8759 + 19.998 = 8778.998 |
Here, the total cost is $8764.
Setup Cost: $9
Process Cost: $2
UoM (Unit of Measure): C (100 EA)
Materials Used:
Material 1: Cost = $10 (per EA)
Material 2: Cost = $5 (per EA)
Material 3: Cost = $20 (per EA)
Number of Finished Goods (EA) generated = 9999
Here, C counts the cost for each 100 EA.
Let's suppose the input is 250 EA and the output is 9999 EA.
Total cost:
| Cost Material1 x 250EA + Cost Material2 x 250EA + Cost Material3 x 250EA + Setup Cost x 1 + Process Cost x (9999EA/100) |
| 500 + 5000 + 1250 + 9 + 2 x 99.99 = 8759 + 199.98 = 8958.98 |
Here, the total cost is $8958.98.